Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBlackcraig Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Blackcraig Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Blackcraig Wind Farm (Wind , Active) Location in the UK : Scotland, Blackcraig Hill Dumfries and Galloway Type of installation: Wind on/offshore: on Turbines :23 Capacity : 69 MW Approx Date of 1st power generation: march 2018
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposed wind farm comprises 23 turbines with a maximum tip height of 110metres and an installed capacity of around 3.0MW each giving an overall site capacity of 69MW. The site was subsequently transferred to Blue Energy in May 2015, with commissioning now scheduled for the spring of 2017. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Blackcraig Wind FarmCorsockCastle Douglas DG7 3DZ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Blackcraig 52.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4032 / N00279W
District:
|
Applicant: |
Blue Energy
Application :
05/n/2005
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
23 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
52.9 |
Site Address: |
Blackcraig Hill, 6km NE of Balmaclellan
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
270500 / 270500
|
Development Status: |
Operational
|
Application Submitted: |
9/30/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/10/2016
|
|
|
Generator Live |
3/2/2018
|
This Record Last Updated: |
5/22/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Blackcraig Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
P00281SQSC
|
Capacity: |
52600
|
Status: |
Preliminary
|
Accreditation Date: |
9/30/2005
|
|
|
Commission Date: |
3/30/2017
|
|
|
Applicant: |
Blackcraig Wind Farm (Scotland) Limited
|
Applicant Address: |
13 Queens Road
Aberdeen
AB15 4YL
Scotland
|
Address: |
Blackcraig Wind Farm
Corsock
Castle Douglas
DG7 3DZ
Scotland
|
Capacity: 105.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/27/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|